Baseline Biodiversity Survey of Dambludi Area (1300 ha) in Dmanisi/Bolnisi Municipalities
Client: JSC Georgian Copper and Gold
Period: 2025 – Ongoing
Activities:
- Baseline Biodiversity Survey of the proposed mine area (flora, fauna, habitats) over four seasons;
- Baseline Ichthyological Survey of the rivers/streams in the area.
Elaboration E&S Risk Assessment for 7 Protected Areas (Lagodekhi PA, Machakhela PA, Aragvi PL, Truso PL, Batsara PL, Kolkheti NP and Kobuleti PL)
Client: The Caucasus Nature Fund (CNF)
Period: 2024 – Ongoing
Activities:
- Preparation of Environmental and Social Risk Assessment and Environmental and Social Management plans for the Protected Areas.
General Operation of the Facility
Client: Poultry Georgia Ltd.
Period: 2024 – 2025
Activities:
- Setup of Environmental Management System;
- Preparation of Environmental and Social Management, Complaints Management and Environmental Monitoring plans for operation of the facility;
- Support in set up of halocarbon containing equipment accounting and reporting framework.
Construction of Apartment Complex in Tbilisi Hills
Client: Mekan Grup
Period: 2024
Activities:
- Preparation of Environmental and Social Management and Waste Management plans for the construction.
Construction of Vaziani-Sagarejo Section of Tbilisi-Bakurtsikhe-Lagodekhi International road funded under Asian Development Bank (ADB) Loan
Client: China Roads and Bridges Corporation Branch of Foreign Enterprise in Georgia
Period: 2023 – 2024
Activities:
- Preparation of Environmental Screening report(s) for project support infrastructure (construction camps, batching plants, stone crushers, steel rebar factory, Spoil Disposal Sites);
- Development of emission and discharges norms for batching plants, camps and other infrastructure as per legal requirements.
Construction of Samgori Wind Power Plant due diligence by Finance in Motion
Client: Vento Energy Ltd.
Period: 2022 – 2023
Activities:
- Preparation of Biodiversity Action and Management Plan and Project Specific Environmental and Social Management Plan for Construction and Operation.
Operation/construction of Kvari-Khorga, Ksani-Stepanstmina, Akhaltsikhe-Batumi Electricity Transmission Lines funded under World Bank, EBRD, KfW Loans/Assistance
Client: Georgian State Electrosystem
Period: 2022 – 2023
Activities:
- Ecological monitoring of electricity transmission line construction/operation (flora/fauna monitoring, ornithological monitoring with specific focus on birds during seasonal migration and their mortality).
Construction of Georgian State Electrosystem’s Tskaltubo Substation 500/220 kV funded under World Bank Loan
Client: BEST ELEKTRIK TAAHUT VE TICARET A.S Branch of Foreign Enterprise in Georgia
Period: 2021 – 2024
Activities:
- Preparation of H&S and E&S Plans and Procedures (Project Area Environmental and Social Management Plan (PAESMP), Waste Management Plan, Landscape Reinstatement Plan, Labor Management Plan, Community Health and Safety Plan, Hygiene and HS Plan, Emergency Response Plan, Community Engagement and Community Relations Management Plan, Worker Code of Conduct and Grievance Redress Mechanism, Land Management and Erosion Control Plan, Re-Cultivation Plan etc.);
- Conducting Pre-Construction Ecological Surveys (Pre-Construction Flora and Fauna Survey with special focus on birds/bats);
- Weekly and monthly environmental and social site inspections, reporting, workforce training (waste management, pollution prevention, transport management, soil management);
- General environmental support/advisory in permitting, liaison with stakeholders, supervisors, government entities.
Construction of Shoropani-Argveta (F4) Section of East-West Highway (E60 Highway) funded under Asian Development Bank (ADB) Loan
Client: Guizhou Highway Engineering Co Group Branch of Foreign Enterprise in Georgia
Period: 2020 – 2024
Activities:
- Preparation of H&S and E&S Plans and Procedures (Specific Environmental Management Plan, Batching Plan, Camp Management Plan, Waste Management Plan, Air Quality Management Plan, Clearance, Re-Vegetation and Restoration Management, Grievance Management Plan, Groundwater Management Plan, Noise Management Plan, Topsoil Stripping and Storage Plan, Vibration Management, Spill Response Plan, Soil Disposal Plan, Emergency Response Plan, Occupational Health and Safety Plan etc.);
- Conducting Pre-Construction Ecological Surveys (Fauna Survey, Habitat Survey, Ichthyological Survey (riv. Borimela and Kvirila), Otter Survey, Tree Survey, Development of Biodiversity Action Plan etc.);
- Monthly environmental and social instrumental monitoring (water (river, discharge), air, noise, vibration);
- Building structural survey within tunnel blasting impact zones;
- General environmental support/advisory in permitting, liaison with stakeholders, supervisors, government entities.
Construction of New Pulp Storage in Bolnisi Municipality
Client: JSC Georgian Copper and Gold
Period: 2021 – 2022
Activities:
- Baseline ecological assessment of the proposed construction area (flora, fauna, forest habitats);
- Baseline hydrological assessment of proposed construction area;
- Biodiversity impact assessment, mitigation and monitoring measures;
- Impact assessment on local microclimate;
- Hydrological impact assessment;
- Emergency Response Plan for mining activities.
Construction of Chumateleti-Khevi (F3) Section of East-West Highway (E60 Highway) funded under European Investment Bank (EIB) and Asian Development Bank (ADB) Loans
Client: China Roads and Bridges Corporation Branch of Foreign Enterprise in Georgia
Period: 2020 – 2022
Activities:
- Monthly environmental and social instrumental monitoring (water (river, discharge), air, noise, vibration).
General Operation of the Facility
Client: JSC Georgian Copper and Gold
Period: 2019 – 2020
Activities:
- Development of safety manuals for operation of compressors on site.
Construction of Internal Roads in Vani Municipality
Client: Palada Ltd.
Period: 2019
Activities:
- Development of Company HS Policy, Risk Assessment, Emergency Response Plan;
- General HS and Emergency Response training of personnel, development of detailed training plan based on results of Risk Assessment;
- Development of equipment HS checklists, alignment of PPE requirements;
- Support in incident and accident investigation process;
- Support in First Aid framework development.